Update Construction Progress Of Perennial Cable Project – Phase 3 On Jun 22, 2020

Main Construction Work :
– Building walls on the 2nd floor of X1-X4 / Y1-Y5 axis, building genetic box of factory E /– Formwork fabrication of the braced mast of attic of factory E– Spray powder for floor beam on 2nd floor of factory E
– Plastering work for exterior wall of factoryF
– Layer 2 wall covering of factory F
– Spotting in stell column for factory F
– Pour base stone of Street A2, remove ground soil of street B3– Combining framework in ditch, installing reinforcement for ditch routes A6-A7, A12-A13– Implementing box opening of floor pipe T3 of house E
– Building sanitary water supply pipes for factory F.
– Fill sand, return the sanitary ground for house E & F
– Acceptance test and installation of rainwater drainage pipes for house E– Fabricating fire fighting pipes at the Fabrication site.
Open box, clear pipe of fire alarm floor T3 in house E

Pictures of construction

Update Construction Progress Of Perennial Cable Project – Phase 3 On Jun 22, 2020
Update Construction Progress Of Perennial Cable Project – Phase 3 On Jun 22, 2020
Update Construction Progress Of Perennial Cable Project – Phase 3 On Jun 22, 2020
Update Construction Progress Of Perennial Cable Project – Phase 3 On Jun 22, 2020