Construction progress of Xindadong Textiles
⦁ • Waterproofing air conditioning room No. 4
• Cleaning and waterproofing wind ditches
• Grinding the machine base
• Chiseling to repair brick tiling on wall
• Cleaning the foundation of axis 22-23
• Cleaning membrane waterproofing of wall foot axis G-H
• Installing settlement joints in the house
• Water pump to waterproof test A-B axis
PREPARATION FACTORY FOR RAW MATERIAL
⦁ • Clean, pump sika flex for settlement joint of floor
• Waterproofing, laminating to create sino-bottom slope L-M, A-B axis
• Putty axis A-B, 20-25
• Cleaning and create settlement joints for brick of floor
• Waterproofing for roof of axis A-B shaft
• tiling Granite for lobby
• Sidewalk leveling
⦁ INFRASTRUCTURE OUTDOOR

⦁ • Combine formwork, pouring concrete for flash curb
• Spread nylon, combine formwork at yard in front of boiler house
• Remove formwork, chisel, grind the dock wall to get goods
• Rolling container yard
⦁ WAREHOUSE

⦁ • Cleaning, pump sika flex for settlement joint of 1st floor
• Putty finished products Warehouse
• Sidewalk leveling
⦁ BOILER HOUSE

⦁ • Building and plastering warehouse walls
• Combine formwork to ditch behind the boiler house
• Plastering coal warehouse wall
⦁ WASTEWATER TREATMENT AREA

⦁ • Cleaning materials, garbage, backfilling soil around mud sedimentation tank.
• Compacting soil, make ground to waste water treatment area
⦁ DORMITORY

⦁ • Compacting land of sidewalks axis A
• Putty, patching exterior outer side
⦁ ME SYSTEM

⦁ • Installing Light power cable, installing camera outdoors.
• Covered asbestos sheathing, installing inox sheet, and air duct expansion joints, factory of raw materials.
• Installing cable to lighting finished warehouse
• Aligning pillars of street light
⦁ FIRE PROTECTION

⦁ • pressure test of pipe line outdoor
• Valve alignment.

Pictures of construction:

Update Construction Progress Of Xindadong Textiles – Dung Quat On Feb 16, 2020
Update Construction Progress Of Xindadong Textiles – Dung Quat On Feb 16, 2020
Update Construction Progress Of Xindadong Textiles – Dung Quat On Feb 16, 2020
Update Construction Progress Of Xindadong Textiles – Dung Quat On Feb 16, 2020