Update Construction Progress Of Xindadong Textiles – Dung Quat On Nov 03, 2019

Update Construction Progress Of Xindadong Textiles – Dung Quat On Nov 03, 2019

construction progress of  Xindadong project

TEXTILE FACTORY

– Installation of air slots; Installation of reinforcement for foundation axis 19-21 / E-H
– Installation of formwork for fan on 1st, 2nd floor of the air conditioning room
– Build the 2nd floor, axis 12-16 / G-H and build a flow room wall in the factory
– Tiling
– Putty axis 12-21 / G-H air conditioning room, 2nd floor, axis 22-23 / A-E, 1st floor
– 
Making wall by corrugated iron, seamlock tole for roof

PREPARATION FACTORY FOR RAW MATERIAL

– Concrete maintenance for factory foundation
– Installation of reinforcement, formwork for drainage ditch
– Suction in drainage ditches in the house
– Putty walls, floor beams in house, the 2nd floor, axis A-B / 1-9;
– Building, plastering wall, axis K-M / 5-11, K-C / 25, G / 1-15, J-K / 16-20, J / 1-20, A-B / 9-16
– 
corrugated iron for wall, install door, roofing corrugated iron

INFRASTRUCTURE OUTDOOR

– Pouring concrete road N3
– Dredging ditch

DORMITORY

– Completion of tiling on the 1st floor
– Clearing ground, glaze seno for 4th floor, axis 1-15 / A
– Tiling 3rd floor, laminating the floor for 2nd, 4th floor
– Building riser; drill hole for riser plastering attic, stairs axis 1 / D-C
– Putty for 1st, 3rd floor and plaster ceiling on the first floor

GUARD’S HOUSE

Building and plastering guard’s house no. 1

WASTEWATER TREATMENT AREA

– Tank No. 2: remove formwork of concrete maintenance for walls
– Tank No.7: clean up materials

MUD SEDIMENTATION TANK

– Installation of formwork for wall phase 2

WAREHOUSE

– Spread floor for deck
– corrugated iron for wall, install purlin, roofing corrugated iron

ME/ ME SYSTEM

– Construction of light electrical systems, compressed air for preparation factory
– Installing cable for dormitory, dropping thread rod for the textile factory lighting system

PCCC/ FIRE PROTECTION

– Connect the preparation factory pipe, dropping thread rod for the textile factory

Illustrating pictures of construction

Update Construction Progress Of Xindadong Textiles – Dung Quat On Nov 03, 2019
Update Construction Progress Of Xindadong Textiles – Dung Quat On Nov 03, 2019
Update Construction Progress Of Xindadong Textiles – Dung Quat On Nov 03, 2019
Update Construction Progress Of Xindadong Textiles – Dung Quat On Nov 03, 2019