Building wall axis 22-23 / A-H, 17-21 / A-B

Installation of reinforcement beam cos + 6.90m

Removing reinforcement of the floor beam on the 2nd floor, axis 12-17 / A-B


PREPARATION FACTORY FOR RAW MATERIAL

Installation of formwork, reinforcement, pour concrete for floor beam  A-B / 16-25 axis

Suck water in machine base

Installation of reinforcement, formwork for column of 2nd floor of air conditioning room

Building wall covering 2nd floor, A-B axis / 1-9-9


KHU XỬ LÝ NƯỚC THẢI/ WASTEWATER TREATMENT AREA

Tank No. 1: fabrication and installation of reinforcement and formwork of floor beam

Tank No. 2: fabrication and installation of reinforcement and formwork of column

Tank No. 3: fabrication and installation of reinforcement and formwork of pedestrian corridor, hanging wall

Tank No. 5: Fabrication and erection of formwork for pedestrian corridor Tank No. 4: removing formwork for concrete maintenance for pedestrian corridor

 INFRASTRUCTURE OUTDOOR

Installation of reinforcement and formwork of bottom, pour concrete for ditch bottom, section M5,6

DORMITORY

Building wall, axis 1-6, 1st floor

Fabrication and installation of reinforcement, formwork for stairs, 1st floor

 WAREHOUSE
– pause
GUARD’S HOUSE
– pause
BOILER HOUSE
– pause
FIRE FIGHTING PUMP ROOM, WATER TANK
-pause
ME SYSTEM
– pause

Một số hình ảnh minh họa:/ Illustrating pictures

Update Construction Progress Of  Xindadong Textiles Vietnam On Sep 03, 2019
Update Construction Progress Of  Xindadong Textiles Vietnam On Sep 03, 2019
Update Construction Progress Of  Xindadong Textiles Vietnam On Sep 03, 2019