Update construction progress of Best Pacific Vietnam Project – Phase 2 on Jun 05, 2019

Contents of construction work:

  1. Completing electromechanical ditches, hot water tanks
  2. Complete lights for 1st, 2nd, 3rd floor
  3. Installing cables
  4. Connect the pneumatic hose
  5. Installing chiller system
  6. Installing wind pipe for 1st, 3rd floor
  7. Fire fighting: installing fire fight water hose for 1st, 2nd, 3rd floor
  8. Painting plaster wall of 3rd floor
  9. screwing for ceiling of 3rd floor
  10. Painting fireproof wall
  11. Clean factory
  12. Digging land for tank D4

Pictures of construction