Update Construction Progress Of Xindadong Textiles Project – Dung Quat On February 02, 2020

construction progress of Xindadong Textiles after tet
PREPARATION FACTORY FOR RAW MATERIAL
⦁ Construction of ramp, flash curb
⦁ BOILER HOUSE
⦁ Construction of base of coal warehouse
⦁ INFRASTRUCTURE OUTDOOR
⦁ Combine formwork, pour concrete for Street D4
⦁ Combine formwork, pour concrete for flash curb
⦁ Dredging mud from the ditch
⦁ ME/ ME system
⦁ Installing sensors for the preparation factory
⦁ Put pipe for camera cable, complete the outdoor hot air pipe
⦁ Repair of dormitory